Our Highway Teamwork Activity, inspired by the factory manufacturing bands, is building bridges between departments – both emotionally and literally.
Each team will build their own bridges based on the pre-determined specifications, aiming to create the best designed bridge. Then we will link them all and all will become one big highway!
At the second part we will race on this highway with our special remote-control cars. Fast & fun!
Participants: As many as wished in 5 – 15 people Teams
Time: 120 – 180 minutes
Gains: Team Work, Motivation, Ice Breaker, Creativity, Fun
Reference Works
Kamil Koç
Çimsa
Otokoç